09

2024

-

12

Announcement of Environmental Impact Assessment for Ship and Marine Equipment Docking Terminal Project of Huanghai Shipbuilding Co., Ltd. before Approval


Huanghai Shipbuilding Co., Ltd. Ship and Marine Equipment Mooring Terminal Project
Public participation in environmental impact assessment before approval
According to the relevant requirements of the "Public Participation Measures for Environmental Impact Assessment", the draft of the "Environmental Impact Assessment Report for the Ship and Marine Equipment Mooring Terminal Project of Huanghai Shipbuilding Co., Ltd." and the public participation explanation are now publicly released for approval, soliciting public opinions and accepting supervision from the public.
1、 Project Overview
1. Project Name: Ship and Marine Equipment Mooring Terminal Project of Huanghai Shipbuilding Co., Ltd
2. Construction location: West bank of Shidao Bay in Rongcheng, Weihai, and old factory area of Huanghai Shipbuilding Co., Ltd
3. Construction content: The project adopts a gravity type sunken box structure to build a new vertical quay wall of 72m and 8m in width on the southeast side of the old factory area of Huanghai Shipbuilding Co., Ltd., and a pier of 260m and 28.8m in width will be constructed along the existing pier. A gravity type block structure will be used to build a new pier of 282.6m and 28.8m in width perpendicular to the existing pier on the northeast side, and a gravity type block structure will be used to build a new pier of 120m and 15m in width perpendicular to the existing pier on the northwest side, as well as dredging the harbor basin.
The total investment of the project is 310 million yuan, of which the environmental protection investment is 823000 yuan, accounting for 0.27% of the total project investment, and the construction period is 24 months.
2、 Name and contact information of the construction unit
Name of Construction Unit: Huanghai Shipbuilding Co., Ltd
Contact: Xia Shude
Phone: 13361190220
3、 Environmental Impact Assessment Report Preparation Unit
Prepared by: Qingdao Marine Geological Engineering Survey Institute Co., Ltd
4、 Pre approval publicity draft and public participation explanation network link:
https://www.alipan.com/s/UnR81U7vuYJ
5、 Ways and means of submitting public opinions
The public can contact the construction unit through telephone and other contact methods.
Huanghai Shipbuilding Co., Ltd
December 9th, 2024